Friday, September 1, 2017

August 24 - continued Report on Lowell School open house - the exterior

It would be better to divide the report on the Lowell School open house on August 24 in two parts - the exterior and the interior, that is the inside and the outside. This would enable the posts to be shorter - the plan is to make the posts shorter so as to make the blog more user friendly.

This post will be about the new exterior of Lowell School.

The lawn in front of the school has been replaced with cement and landscaping. All older trees have been removed. Second, the shell of the school has, fortunately, been left intact - it is so beautiful so I was glad about that. The back of the building was connected to a new addition on the west side. So-that part of the historical building has been eliminated.

The Phillips Street entrance is where the school officials wanted people to enter. So we did not go into the main entrance. At first glance, it appears that the structure of the inside of the front entrance as seen from the outside was not changed totally, however the beautiful woodwork was either painted over or had been removed.


No comments:

Post a Comment